Gilbert Neely Bridge

Project Name: Western Canal Powerline Trail UPRR Crossing

Construction Cost: $3,579,039.44

Description: CS Construction, Inc. constructed new grade separated crossing of the UPRR and includes constructing sidewalk, retaining walls, bridge structure, signing, striping and other related work.

  • Total length of 858’

  • West section consisted of 9 35’ spans

  • Center section was steel truss bridge manufactured by Stinger Bridge and Iron

  • East section consisted of 10 35’ spans. 235,380 pounds of rebar in the bridge

  • 875 cubic yards of structural concrete

  • 696 LF of drilled shaft foundations