ADOT Verrado Way To SR85

Project Name: Verrado Way To SR85 - TRACS #F011901C

Date: June 2021 - Current

Construction Cost: On-Going

Description: CS performed all of the Lighting, Traffic Signal, APS Underground Utility and Intelligent Transportation System (ITS) for this 10 mile stretch of existing freeway. Work included:

  • 2 Complete Traffic Signal Interchanges (1 Diverging Diamond Interchange)

  • 4 DMS Butterfly Structures

  • Thermal Detection Imaging

  • Fiber Node Building

  • 8 CCTV Cameras

  • 150+ LED Light Fixtures and Poles

  • 50+ Traffic Loop Detectors

  • 125,000+ of new fiber optic cable

  • Directional Drilling

  • Open Trenching

  • 88,000’ of Plowed 7-Way Mircoduct