Loop 303 Design Build
Project Name: Loop 303 Design Build – US 60 to Happy Valley
Construction Cost: $1,719,400.00
Description: CS Construction, Inc., in partnership with FNF as the General Contractor, worked to provide a complete Lighting, FMS, and Signage package along these projects limits:
Trench and Backfill over 175,000 lf of conduit for ADOT FMS, ADOT Lighting, and City of Surprise facilities
Installation of Ramp Lighting, Median U-Pole Lighting, and High Mast Light Poles
Conducted both plan and contractibility review with GC and Designer during design phase
Revamp the Existing Freeway Sign Infrastructure