Gilbert Neely Bridge
Project Name: Western Canal Powerline Trail UPRR Crossing
Construction Cost: $3,579,039.44
Description: CS Construction, Inc. constructed new grade separated crossing of the UPRR and includes constructing sidewalk, retaining walls, bridge structure, signing, striping and other related work.
Total length of 858’
West section consisted of 9 35’ spans
Center section was steel truss bridge manufactured by Stinger Bridge and Iron
East section consisted of 10 35’ spans. 235,380 pounds of rebar in the bridge
875 cubic yards of structural concrete
696 LF of drilled shaft foundations